Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

"Control the standard by the details, show the power by quality". Our firm has strived to establish a extremely efficient and stable employees crew and explored an effective excellent command method for Glass Panel Lifting Equipment, Material Handling Suction Cups, Mobile Elevating Work Platform, We've been glad that we have been steadily escalating using the energetic and long lasting assist of our pleased shoppers!
Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan Detail:

The auxiliary walking double-column aluminum alloy lifting platform is a new generation of updated products. The whole is made of high-strength aluminum profiles. Due to the high strength of the profiles, the deflection and swing of the lifting platform are extremely small. It adopts double mast structure, which has large load capacity, large platform area, excellent stability, flexible operation, and lighter battery-assisted walking. Its lightweight appearance enables high lift capacity in a very small space. The new product battery-assisted walking aluminum alloy lift is widely used in factories, hotels, buildings, shopping malls, stations, airports, stadiums, etc. It can be used for installation and maintenance of power facilities, building decoration, overhead pipelines, etc., and high-altitude operations for one or two people such as high-altitude cleaning.

Scope of application

The aluminum alloy aerial work platform is suitable for the repair, maintenance and cleaning of shopping malls, hotels, restaurants, interior decoration, layout, space light lines, pipelines, doors and windows, and is suitable for space operations in rooms with narrow areas or spaces.

Name

Model No.

Max.Platform Height(M)

Load Capacity(KG)

Platform Size(M)

Voltage (V)

Power(KW)

Net Weight(KG)

Overall Size(M)

Dual Mast

DMA6-2

6

250

1.38*0.6

custom

1.5

480

1.45*0.88*1.75

DMA8-2

8

250

1.38*0.6

1.5

560

1.55*0.88*2.05

DMA9-2

9

250

1.38*0.6

1.5

620

1.55*0.88*2.05

DMA10-2

10

200

1.38*0.6

1.5

680

1.55*0.88*2.05

DMA12-2

12

200

1.48*0.6

1.5

780

1.65*0.88*2.05

DMA14-2

14

200

1.58*0.6

1.5

980

1.75*0.88*2.25

Instructions

1. Open the support arm to 135° before operation (see the picture), rotate the outrigger wire cylinder, adjust the base to the level, fasten the safety rope, check whether the travel switch is firm and sensitive, and whether the upper control button is normal, it can be operated When the platform is lifted and raised to the working height, the staff must wear a safety belt and lock it on the body and solid objects.

2. Lifting operation: It is divided into upper and lower control lifting and flashlight dual-purpose. Operate according to the marked symbol. Check whether the hand pressure valve is closed before use. low position.

3. When the elevator is operating, the diameter of the power cord should not be less than 4 square mm, and the length should not exceed 20 meters.

4. Do not drop items into the chute during operation.

5. Overload operation is not allowed.

6. The lift is not lowered to the low position, and it is not allowed to move the whole machine.

7. Outdoor work is prohibited in windy and rainy weather.

Details

p-d1
p-d2
p-d3

Factory Show

product-img-04
product-img-05

Cooperative Client

product-img-06


Product detail pictures:

Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan detail pictures

Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan detail pictures

Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan detail pictures

Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan detail pictures

Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan detail pictures

Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan detail pictures


Related Product Guide:

"Control the standard by the details, show the power by quality". Our business has strived to establish a highly efficient and stable team staff and explored an effective good quality regulate course of action for Factory making Hydraulic Lift Work Benches - Electric Assisted Walking Brig Aluminum Man Lift – Heshan , The product will supply to all over the world, such as: Turkey, Mumbai, Pakistan, Now, we professionally supplies customers with our main merchandise And our business is not only the "buy" and "sell", but also focus on more. We target to be your loyal supplier and long-term cooperator in China. Now, We hope to be the friends with you.
  • This enterprise in the industry is strong and competitive, advancing with the times and develop sustainable, we are very pleased to have a opportunity to cooperate!
    5 Stars By Honey from Ecuador - 2018.11.11 19:52
    Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Heather from Mozambique - 2018.02.21 12:14
    Write your message here and send it to us